At a glance
> Reservoir : 27,8 hm3 - 421 ha
>  Main dam : 1455m long - 14m high
> Design flow of the power plant : 980 m3/s
> Installed capacity : 420 MW (7 x 60 MW)
> Commissioning by 2020 (1st turbine) - 2021 (last turbine)