Carriere


At a glance
> Reservoir : 27,8 hm3 - 421 ha
>  Main dam : 1455m long - 14m high
> Design flow of the power plant : 980 m3/s
> Installed capacity : 420 MW (7 x 60 MW)
> Commissioning by 2022


Press releases



Carriere


Documents

-Newsletter

application/pdf FI n2021-51 - Zero Malaria At Nachtigal - vD.pdf (558.2 KiB)

application/pdf FI n°2020-41 - Installation of the first overhead crane.pdf (667.7 KiB)

application/pdf FI n°2021-42 - First deliveries from Local Producers organisations already done.pdf (497.6 KiB)

application/pdf FI n°2021-44 - Unwinding of Transmission Line cables gets started.pdf (570.9 KiB)

application/pdf FI n°2021-43 - Preventive archaeology mainstreamed from the very beginning of Nachtigal Project.pdf (510.0 KiB)

application/pdf FI n°2021-48 - NHPC takes up gender challenges - 2021 03 31.pdf (514.7 KiB)

application/pdf FI n°2021-47- Dynamic and Passionate Women on Nachtigal Construction Site - 2021 03 18 - vD.pdf (459.1 KiB)

application/pdf FI n°2021-46 - First visit to the site by Vincent Leroux NHPC new GM.pdf (461.5 KiB)

application/pdf FI n°2021-49 - NHPC contributes to the preservation of the Mpem and Djim National Park.pdf (597.3 KiB)

application/pdf FI n°2021-45 - Norbert Priso New Finance Director NHPC.pdf (433.8 KiB)

application/pdf FI n°2020-40 - NHPC keeps on providing support to Ntui Technical High School-.pdf (499.1 KiB)

application/pdf FI n°2020-39 - 5 million man-hours without a major accident.pdf (530.2 KiB)

application/pdf FI n°2020-38 - Patrick Bellet new Operations Director.pdf (437.6 KiB)

application/pdf FI n°2020-36 -NHPC Supports Health Institutions in the fight against Covid-19 - vD.pdf (568.6 KiB)

application/pdf FI n°2020-35 - Pouring of the first hydraulic concrete of the final structures of Nachtigal.pdf (600.2 KiB)

application/pdf FI n°2020-34 - Reception of the the excavation bottom bed of the water intake of the headrace canal.pdf (637.7 KiB)

application/pdf FI n°2020-32 - The Relocation of the Families Impacted by the Project has been completed.pdf (536.5 KiB)

application/pdf FI n°2020-31 - Start of foundation works of the power transmission line.pdf (637.4 KiB)

application/pdf FI n°2020-30 -Cameroon's recognition to Mr Pierre Edimo Deputy Managing Director of NHPC.pdf (480.0 KiB)

application/pdf FI n°2020-29 - Workers' Health and Safety, Top priority of the Nachtigal project.pdf (467.0 KiB)

application/pdf FI n°2020-28 - Testimony from a resettled farmer.pdf (615.3 KiB)

application/pdf FI n°2020-27 - Start of works on the corridor of the future power line.pdf (499.1 KiB)

application/pdf FI n°2019-23 - Visit of the Minister of Energy and Water Resources and the Chairman and CEO of EDF VP.pdf (632.1 KiB)

application/pdf FI n°2019-21 - Mining operations commence - vD.pdf (526.7 KiB)

application/pdf FI n2019-20 - Djeinabou Souleyman, NHPC's new Human Resources and Genera....pdf (723.6 KiB)

application/pdf FI n2019-19 - Signing of a good collaboration commitment charter.pdf (889.0 KiB)

application/pdf FI n°2019-18 - Nachtigal strengthens its partnership with IFC.PDF (913.4 KiB)

application/pdf ENGLISH FI n°2019-17 - Arrival of heavy machinery and start of earthworks at Nachtigal’s project site.pdf (544.8 KiB)

application/pdf ENGLISH FI n°2019-16 - Botanical samples from the Nachtigal site to enrich the collections of the Cameroon National Herbarium.pdf (599.9 KiB)

application/pdf English FI n°2019-15 - Start of geotechnical surveys on the 225,000 volt Nachtigal-Yaoundé power line corridor.pdf (598.6 KiB)

application/pdf ENGLISH FI n°2019-14 - Prevention of gender base violence.pdf (469.2 KiB)

application/pdf English FI n°2019-13 - Implementation of the first phase of support to fishermen affected by the Project.pdf (382.4 KiB)

application/pdf English FI n°2019-12 - Deforestation works begin.pdf (574.8 KiB)

application/pdf English FI n°2019-11 - Launch of recruitment campaign at NHPC.pdf (508.5 KiB)

application/pdf English FI n°2019-10 - Nachtigal receives prize at the 2018 PFI Awards.pdf (604.4 KiB)

application/pdf English FI n°2019-09 - Handing of farming equipment to producer organizations.pdf (603.8 KiB)

application/pdf English FI n°2019-08 - Eric Koffi, NHPC’s new Finance Manager.pdf (421.5 KiB)