> Reservoir : 27,8 hm3 - 421 ha
>  Main dam : 1455m long - 14m high
> Design flow of the power plant : 980 m3/s
> Installed capacity : 420 MW (7 x 60 MW)
> Commissioning by 2021


Press releases



Carriere


The Nachtigal Amont Project

The State of Cameroon has identified the construction and operation of a hydroelectric facility of 420 MW at the Nachtigal-amont site on the Sanaga river as a major priority insofar as it will enable to secure an additional, stable source of electricity generation that will further strengthen the Cameroonian electric system.

 

 

tl_files/fM_k0001/images/developpeurs.png

ABOUT DEVELOPERS

On 8 November 2013, the Nachtigal amont Consortium comprising (...)

tl_files/fM_k0001/images/situation_geographique.png

PROJECT LOCATION

The Project is located on the Sanaga River about 65 km north-east of Yaoundé, in the central region  (...)
tl_files/fM_k0001/images/composantes.png PROJECT OUTLINE
The hydroelectric facility consists of the following elements (...)